UT alternative RT as per UW-11 and table UW-12

As per UW-11 and drawing required full RT-1 in ASME VIII div. 1.
in this case, are Cat. D joint (nozzle type set in) compulsory UT in lieu of RT?

Any NDE is not required when Cate.D is set-in type

1 Like