EN 10210 - Hot finished structural hollow sections and review MTC

Hot finished structural hollow sections of non-alloy and fine grain steels

Find latest edition, here.

  • Part 1: Technical delivery conditions.
  • Part 2: Tolerances, dimensions and sectional properties.

Normally verification of MTC such mechanical properties, chemical compositions, size, dimension and delivery condition.

Additional information must be checked in MTC.

  1. Inspection type: non-specific inspection or specific inspection.

OK, find out inspection documentation.

  1. Verification of inspection programme.
  • Table 2: Inspection programme for non-alloy steels in accordance with Annex A.
  • Table 3: Table 3 — Inspection programme for fine grain steels in accordance with Annex B.

Common mistake:

  • Missing NDT test for weld seams in specific inspection.
  • Not clearly test methods of NDT and destructive test, size of test coupon, location of test specimen, standard/acceptance criteria application.
  • Product test are not stated size and location of test specimen.
3 Likes